Mineral Processing EPC

Xinhai EPC provides services of sample test, mine design, equipment manufacture, etc. for clients, and solves the common problems in plant construction such as budget over-run, schedule delays, unqualified equipment, unclear recovery benefit, disputes of the manufacturers, and unclear responsibility of after-sale service

  • Designed Capacity Reached

    Our commitment—— standard product quality and consumption index, controllable production cost, stable equipment operation! The target reached of Xinhai EPC includes expected recovery rate reached, design capacity for clients reached, the quality of product reached, consumption indicators meeting re…

  • Personnel Training

    Step-by-step develop your own technical team for you, ensuring the normal operation of mineral plant It is simultaneous for worker training and installation & commission in order to save time and cost. Worker training has two purposes, one is to make the dressing plant works earlier and produc…

  • Installation and Commission

    Equipped with the most experienced technical personnel on-site installation and debugging, making your equipment quickly put into production in the best state. Installation and commission is key link of realizing dressing test, mine designandequipment manufacture, and directly takes influence on p…

  • Equipment Manufacture

    We have three production factories, hundreds of suppliers, providing you with mineral processing equipment, mining supporting materials, installation and maintenance tools and laboratory facilities, etc. Equipment manufacture is in the charge of Xinhai mine production plants that covers an area of…

  • Mine Design

    Certified grade A of mineral design institute, high quality drawing, simulate mineral plant with CAD and 3D, guarantee the construction period The key to mine design is all must be established on the basis of detailed investigation, and therefore Xinhai Mine Design Institute will firstly take a co…

  • Mineral Dressing Test

    Strive for the best recovery for you with rigorous test, accurate data and detailed report I Preparation before test The clients should provide about 50g representative samples, some special samples about 200~1000g. The simple test needs 30 working days, and the detailed test about half a year. Sig…

  • Engineering Consulting

    Solve all your questions with 20 years of beneficiation plant experience I Purpose of Engineering Consulting Engineering consulting makes clients have a comprehensive understanding of the value of mine, the useful elements, available mineral processing technology, plant size, required equipment and…

Leave Message

Please leave your message here! We will send detail technical info and quotation to you!

Products:
Materials:

Capacity :
* Name :
* Email :
* Location :
* Tel :
* WhatsApp :
* Message :

Leave Message!